Untidy Child

Alex is a student at an unnamed school, currently in the midst of woodworking class. He’s wearing his uniform and has picked up his tools, ready to start working on his project – a boat. The boat is small but intricate, with plenty of curves and angles that are sure to make it a challenge… Continue reading Untidy Child

another angle that clearly shows the darker “filleting” compound contasting with the dimples and voids that it filled in the lighter colour “adhesive” epoxy which was used when the plank was hung

applying fibreglass tape to the base panel joints Posted by Dale Simonson on 2012-09-24 02:18:14 Tagged: , boat developing , John Welsford , sail , Modest Craft Advisor Magazine Task , Welsford Scamp , picket boat , woodwork , boat shop , boat yard , Northwest Maritime Center and Picket Boat Foundation , Northwest University… Continue reading another angle that clearly shows the darker “filleting” compound contasting with the dimples and voids that it filled in the lighter colour “adhesive” epoxy which was used when the plank was hung

3″ tape laid out

applying fibreglass tape to the bottom panel joints Posted by Dale Simonson on 2012-09-24 02:13:58 Tagged: , boat developing , John Welsford , sail , Little Craft Advisor Magazine Challenge , Welsford Scamp , wood boat , woodwork , boat shop , boat property , Northwest Maritime Center and Wood Boat Basis , Northwest College… Continue reading 3″ tape laid out

new legs on old door, some space to lay things out (but only while the 11-month rainy season holds off!)

applying fibreglass tape to the bottom panel joints Posted by Dale Simonson on 2012-09-24 02:15:12 Tagged: , boat building , John Welsford , sail , Small Craft Advisor Magazine Venture , Welsford Scamp , picket boat , woodwork , boat store , boat garden , Northwest Maritime Middle and Picket Boat Foundation , Northwest Faculty… Continue reading new legs on old door, some space to lay things out (but only while the 11-month rainy season holds off!)