DW2 (52)

Today I solved the issues with the heights of the concealed slopes. Experienced 3 significant details exactly where, in the previous, I attached the bottom of the wooden precisely on the points where by the leading of the rail need to be. All looks high-quality now, started out the woodwork for level Posted by Rinus… Continue reading DW2 (52)

DW2 (24)

Finally….. 3 several years in the past I bought some LSmodels NS Plan-W, today I could just take them out of the box and operate the initially meters. Posted by Rinus H0 on 2016-12-16 20:11:29 Tagged: , modeltrains , modelrailways , modelleisenbahn , modelspoor , modeltreinen , DW2 , slopes , woodwork , concealed ,… Continue reading DW2 (24)

13 nov 2011 C

Arranging! Now permit me make clear the “website traffic-tunnel” challenge. As you can see the carcase get the job done has begun by stitching. A) Below comes a traffice tunnel below the tracks. B) This is heading to be the exit from the railroad property down into the targeted visitors-tunnel. C) Bridge prepared D) Bridge… Continue reading 13 nov 2011 C

DW2 (37)

Laying the woodwork and tracks which are on prime of 1 of the concealed yards. No problems in this article, all sleek in accordance to planning. Posted by Rinus H0 on 2017-02-04 20:04:03 Tagged: , Modeltrains , Modelrailways , Modelleisenbahn , Modeltreinen , Modelspoor , Modelbouw , DW2 , H0 , 1:87 , Roco ,… Continue reading DW2 (37)

13 nov 2011 E

Scheduling once again! A) This is likely to be a long wall which separates the town (on best of the wall, larger amount) from the property. B) Properties and roadways planned on the bigger level. C) Woods and mother nature planned. D) This is the tunnel in which the single diesel track starts off. It… Continue reading 13 nov 2011 E