The task at hand involved the removal of old boards and hardware from a structure. The boards and hardware in question were likely coated in lead, which added an added layer of complexity to the process.

The removal process likely involved a number of steps. Firstly, the area was likely sectioned off and contained to minimize the spread of lead particles. This may have involved the use of plastic sheeting or other barriers.

The boards themselves were likely removed using various tools, such as pry bars or saws, depending on their size and location. Great care would have been taken to avoid damaging the surrounding surfaces, as well as to avoid creating additional lead dust.

Once the boards were removed, the hardware would have been carefully detached and removed as well. This may have included screws, nails, or other fasteners, all of which would need to be treated as lead-contaminated and disposed of accordingly.

Throughout the process, everyone involved would have been required to wear appropriate protective gear, including respirators, gloves, and full-body suits. Cleaning and decontamination procedures would have been followed to ensure that no lead dust or particles were left behind.

Overall, the removal of old boards and hardware coated in lead is a complex process that requires great care and attention to detail. By following strict safety protocols and using specialized tools and techniques, it is possible to complete the task safely and effectively.