Day 72 of 365 Y2 – Allow to Dry Prior to Touching

72/365 Y2 - LET DRY BEFORE TOUCHING

The author of this content is sharing their experience with a DIY headboard project, which is taking longer than anticipated due to the amount of stain needed and the required drying time. The cost of the project is outlined, including lumber, glue, stain, varnish, brushes, nails, and dowels. The author also mentions the importance of not spilling stain on their carpet. They go on to provide technical details for a photo they took of the drying headboard, including shutter speed, aperture, ISO, lens, and focal length. The setup took around 5 minutes, though the author notes that the overall experience took longer. The photo was taken at 2:52pm.

Posted by Arieseffects on 2010-06-19 03:11:40